ENGG 2100 Practice Flashcards | StudBud
Explore
/
ENGG 2100 Practice
ENGG 2100 Practice
87 terms
·
StudBud Administration
·
118 plays
Practice exam for ENGG 2100 Final
Flashcards
87 cards
F
Practice quiz
P
Host live
L
Questions
87
Answers
1
What is an Real Life example of a Design Mistake?
Tiger Tank
Challenger Spacecraft
Dyson Robot Vacuum
Mosquito Aircraft
2
What are the benefits of Teamwork?
Distributed workload
Generation of Diverse Ideas
Competitive Atmosphere
All of The Above
3
What Solidworks feature allows you to create a spring?
Extrude boss
Swept Boss
Loft Base
Hole Wizard
4
What is a question you should ask during the Prototype phase?
How can we guarantee the prototype will be suitable for use?
Can the Prototype be used by Quality Assurance experts
All of the above
How will we check build quality?
5
Unnecessarily tight tolerances will result in?
Increased safety
Improved component quality
Increased cost
Decreased waste
6
What Organization oversees WHMIS?
Canadian Standards Association
PEO
Technical Standards and Safety Authority
Ministry of Labor
7
What are some skills needed to chair a meeting?
Firmness in keeping things on schedule
Ability to deal with partners
Flexibility in dealing with different points of view
All of the above
8
What is an effective team requirement?
Disagreement and conflicts that are not resolved
None of the above
Constructive Criticism
Dominating Leader
9
What are the Responsibilities of an Employer
All of the Above
Take Blame encase of Accident
Appoint competent person as Supervisor
Provide PPE and inform workers of Hazards
10
What Solidworks feature allows you to copy an existing feature and multiply it?
Mirror
All of the Above
Linear Pattern
Circular Pattern
11
True/False; You don't have to put a drawing # in the title block if you only have one drawing
False
True
12
The development of ‘assembly line’ based manufacturing is an example of which design evolution?
Incremental
Revolutionary
Big and Bold
None of the above
13
Design Criteria are best described as:
Limitations
A detailed list
Constraints
Design goals
14
How many Solidworks Assembly mates would it take to fix 2 rectangular bars together?
3
1
4
2
15
To be successful in design one must consider...
Conceptualization, Materials, and Use
Development, Prototyping, and Marketing
All of The Above
Manufacturing, Life Cycle, and Target Market
16
What is a limitation to a decision matrix?
Results can be far off from their actual worth
Not usually valid if equal weighing
Misleading
All of the above
17
What are the strengths for people with a gold personality?
Predictable
Organization
Stable
All of the Above
18
Sustainable Development Must Incorporate which aspects?
Economical, Environmental, and Social
Environmental, Economical, and Ethical
Social, Economical and Physical
Social, Environmental and Political
19
True or False: 3D Printers Have exact dimension capabilities so you can ignore tolerances
False
True
20
True or False; Management tools are used in just the beginning of the design process?
True
False
21
Definition of "Safe"
Safe if risks are judged acceptable
Safe if Employer says so
Safe is hazards are judged acceptable
Safe if PEO says so
22
What Solidworks sketch tool(s) would you use to create a star (Fewest Steps)?
Line and Mirror Tools
Just Line Tool
Polygon and trim Tools
Polygon and Mirror Tools
23
What is the most important aspect of design?
Driving Force
The Team
A Great Idea
Success Requirements
24
What Plane was made completely out of Wood?
Avro Arrow
Tiger
Challenger
Mosquito
25
What is The Company That Developed Solidworks?
Dassault
Solidworks
Siemans
NX
26
What Solidworks feature would allow you to hollow out a part?
Rib
Fillet
Shell
Draft
27
Recycling plastics is usually of which form?
Hydrophobic
Thermoplastics
Hydrophylic
Thermosetting
28
What is the 1st step in the Design Timeline
Genesis of an idea, concept or motivation
Build a team
Create a Mission or vision
Develop Concept
29
What colour style is considered the "Trouble Shooter/Negotiator"
Green
Gold
Orange
Blue
30
Which statement best describes Quality Assurance and the design process?
Quality Assurance is a late focus in the design process
Quality Assurance affects only manufacturing
Quality Assurance must be designed into a project
Quality Assurance is unimportant to design and development
31
Design mistakes can come from...?
Design decisions
Failure to Anticipate
All of the Above
Ignoring Safety Measures
32
Mathematical tools are used primarily in the following stages engineering design development:
Team building through to final prototype testing
Design concept through to final design testing
Prototype testing through to final design testing
All stages of development
33
What form of engineering is associated with historical fortifications found in Canada?
Military Engineering
Mechanical Engineering
Civil Engineering
Railway Engineering
34
True/False; If the content or process component breaks, chances of solving the problem are less
False
True
35
Which is an example of a "Big & Bold" Idea
Helicopter
Avro Arrow
Model T
Mini Engine
36
What Solidworks Feature would allow you to draw on a surface tangent to a curved surface?
Reference Point
All of the Above
Reference Axis
Reference Plane
37
What is an example of a Mathematical tool?
Labview
Matlab
Excel
All of the Above
38
What Drawing view would you use to see the inside of a part in Solidworks?
Section View
Detail View
Exploded View
All of the above
39
True or False; you can change the weight of a part in Solidworks?
True
False
40
Which ISO is associated with "Environmental Management"?
ISO 5000
ISO 14000
1SO 7800
ISO 9001
41
What Solidworks feature allows you to see a realistic version/staged view of your part?
Solidworks Rendering
Solidworks Simulation
Solidworks Analysis
None of the Above
42
Which ISO is associated with "Quality Management"?
ISO 14000
ISO 7800
ISO 9001
ISO 5000
43
True or False; The relationship between functionality and size/shape of an object does not vary
True
False
44
An example of a Hazard is..?
Disease
Technological Failure
Accident
All of the above
45
True or False; Sketches can be quick and dirty but signed for legal reasons
False
True
46
What are some parameters Affecting Teamwork?
The Leader and Members
All of the Above
Group Dynamics and the Project
External Pressure
47
True/False; if you know your product is amazing than your profit chart will have a linear slope
True
False
48
What Solidworks Feature Would Give You The Red Section?
Chamfer
Fillet
Trim
Curve Surface
49
A Risks Assessment weighs...?
Priorities vs Cost
Consequences vs People at Fault
Cost vs Safety
Potential vs Consequence
50
What design constraints typically affects all stages of the design process?
Production Availability
Regulations
Cost
Time
51
True/ False: You do not have to fill out the title block in a 2D Drawing, its just for industry
True
False
52
A Detailed View In Solidworks Drawings Allows you to...?
Creates all the dimensions associated with the part
Splits apart an assembled product into multiple parts
Zoom in on a already created view
See the inside of a part
53
For Solidworks Drawings, Dimensions Should Be:
Doesn't Matter
All Vertically Aligned
All Horizontally Aligned
Aligned Diagonally to allow for more Dimensions
54
What is a "Transition Fit"?
Parts may be loose or forced together
The Allowance is positive and greater than zero
Parts must be forced together
specified system of precision fits
55
The Term 'Total Design' Describes:
A design Philosophy
A contrast to incomplete design
Commitment to design excellence
Intuitive design
56
True/False; An agenda should be shared with everyone to be more productive during the meeting?
True
False
57
What is the goal for people with a Green personality?
Action
Competency
Belonging
Find meaning to life
58
What is Wrong With this Drawing?
Dimension are orientated Incorrectly
Scale Is Too Small
All of the Above
Part is Coloured
59
What Basic functions do groups perform
All of the above
None of the above
Content: Proposing then discussing ideas that come together
Process: Working, cohesive environment, everyone contributes
60
What are some category('s) in a Evolutionary Design Solution?
Discovery
Invention inside/outside Paradigm
Apparent and Improvement
All of the Above
61
True/False; Individual success depends on projects success?
False
True
62
What are things to consider when choosing a meeting location?
Table and Seating Layout
Maps and Directions
Extension cords, tech support, etc
All of the above
63
What Is Good About This Drawing?
Appropriate Scale
All of the above
No Dimensions on the part which the Detailed views are taken
Dimensions are Horizontally Aligned
64
Which of the following is not critical to a meeting?
Chair
Location
Agenda
Record Keeper
65
What Solidworks Feature Would Allow You to get the Red Section in the Picture?
All of The Above
Loft Base
Revolve Cut
Revolve Base
66
True or False; Math/Technical skills are used primarily through middle stages?
False
True
67
True/False; You can have one view on a Drawing so long as it is reasonable scaled/dimensioned
False
True
68
True or False; Ethics is a topic that can only be dealt by regulatory perspectives
False
True
69
What is the Number 1 Goal in Engineering/Design
Create something awesome
Minimize Cost as much as possible
Protect and safeguard the public
Maximize Success by remembering the design process
70
In reports, caption for figures,
Are optional
Must stand alone
Must not repeat information from main body
Must be short
71
What is important to keep in mind when first brainstorming an idea?
Open Environment to all "crazy" ideas
All of the above
Debate ideas
Pick final idea
72
Which of the following need to be considered when designing objects that humans interact with?
Unexpected Behavior
All of the above
Environment
Human capabilities/limitations
73
Which is an Example of a "Revolutionary" idea?
All of the Above
Model T
Mini Engine
Helicopter
74
True or False: Isometric Views can Have Dimensions on them
True
False
75
What Requirements do you need to become a Professional Engineer in Ontario
Education from any school, 3 years in industry, ethics exam
Education(accredited school)4 years in industry, ethics exam
Education(accredited school) and ethics exam
Education(accredited school) and 5 years in industry
76
Which is an Example of a "Incremental" idea?
Flat Screen->Tube TV
BB8->R2D2
Model T-> Hummer
Apple-> Orange
77
Which colour of the True Colours assessment is "Not usually Engineers"
Green
Orange
Blue
Gold
78
Group development occurs in 4 stages, which of the following is Not a stage?
Storming
Forming
Norming
Scoring
79
Why is ergonomics important for design?
Consistency
Shorter learning curve for user
All of the above
Safer Operation
80
Which non-for-profit organization oversees and coordinates standardization efforts?
TSSA
PEO
CSA
WSIB
81
What is the Max fine an Individual can receive for breaking safety protocols?
25,000
12,500
50,000
500,000
82
What is the 3rd stage of Group Development
Performing
Forming
Norming
Storming
83
Define Sustainable Development
Process so current needs to not compromise future needs
None of the above
Process of developing businesses, communities for the future
Process of developing communities, cities for current needs
84
True or False; You can trace a picture in Solidworks?
False
True
85
True/False; As a designer you are not responsible for Quality Assurance
True
False
86
Governs under the Professional Engineers Act Include?
Standards For Practice
Professional Awareness
Standards for Knowledge and Skill
All of the above
87
What does WSIB stand For?
Workplace Safety and Industry Board
Workplace Safety Investigation Board
Workplace Safety Insurance Board
Workplace Safety Information Board