Phase gate milestones:
Optimum batch size is an example of:
Coaches Leading SAFe: Lesson 3
10 terms
·
StudBud Administration
·
14 plays
Quiz for Lesson 3 of Leading SAFe
Flashcards
10 cards
F
Practice quiz
P
Host live
L
Questions
10
Answers
1
Optimum batch size is an example of:
None of the above
U curve optimization
S curve optimization
C curve optimization
2
Phase gate milestones:
Force too early design decisions
Assume a point solution
Create long queues
All of the above
3
Exploiting variability can:
Both A and B
Improve economic results
Neither A nor B
Reduce risk
4
Which of the following is not a SAFe Lean-Agile principle?
Base milestones on objective evaluation of working systems
Take an economic view
Apply cadence, synchronize with cross-domain planning
Always centralize decision making
5
Which of the following is not a benefit of cadence?
Decreases costs
It makes wait times predictable
Limits batch size to a single interval
Eliminates scheduled integration points
6
Taking an economic view includes:
Doing what ever your boss says
Centralizing decision making
Quantifying the Cost of Delay
Considering money already spent
7
What does limiting WIP promote?
High utilization
Long queues
None of the above
Flow
8
Fast Learning cycles:
Decrease the time between action & effect
Increase the cost of risk taking
All of the above
Facilitated by large batch sizes
9
Which type of decision should be centralized?
All
Frequent
Time Critical
Infrequent
10
According to systems thinking, a system can evolve no faster than its slowest integration point
False
True