9189 phase 1 plumbing cold water ppt 3 Flashcards | StudBud
Explore
/
9189 phase 1 plumbing cold water ppt 3
9189 phase 1 plumbing cold water ppt 3
11 terms
·
StudBud Administration
·
654 plays
Imported from external platform
Flashcards
11 cards
F
Practice quiz
P
Host live
L
Questions
11
Answers
1
Which C W system could you find a drinking header?
Open vented S plan
Direct boosted CW
Direct CW
Indirect boosted CW
2
Why are float switches required in cisterns for direct and indirect boosted cw systems
To inform the customer the water level
Improve the pressure in the cistern
To start or stop the pumps
To improve water quality
3
How many players are on the ice when 2 ice hockey teams are playing each other?
7
12
6
5
4
Which cold tap or taps are fed straight from the mains in a direct cold water system
All cw taps
Bath
Kitchen sink
Basin
5
A cold water storage cistern is only required on direct cold water for supplying a hot water cylinder
True
False
6
Direct boosted cold water systems are not allowed if demand is more than ?
0.2 L/s
12 L/m
1 L/m
0.5 L/s
7
Which system would you find a break cistern ?
Direct boosted CW
Indirect boosted C W
Indirect CW
Direct CW
8
Bore holes can be drilled as deep as ?
50m
1km
40m
20m
9
Who was king/ Queen after Elizabeth 1st ?
James 1st
Henry 8th
William the conquer
Elizabeth 2nd
10
What pipe size ( minimum) is required for a cold water supply to a 3-4 bed house ?
15mm
22mm
28mm
10mm
11
In an indirect cold water system which appliance will be fed direct from the mains for drinking water?
Kitchen sink
Bath
Basin
Bidet