stud
bud
Sign up
Log in
Home
Library
Explore
SAT
More
Duplicate of Revision unit 104 Flashcards | StudBud
Explore
/
Duplicate of Revision unit 104
what kind of location would these be used for?
What is this?
Duplicate of Revision unit 104
23 terms
·
StudBud Administration
·
30 plays
7202 unit 104 revision 2
Flashcards
23 cards
F
Practice quiz
P
Host live
L
Questions
23
Answers
1
What is this?
<p>plastic screw</p>
self drilling screw
mirror screw
self tapping screw
2
what kind of location would these be used for?
<p>securing flower beds</p>
<p>securing floorboards</p>
plasterboard
brick
3
what is this designed to drill
wood drill bit
plastic bit
ceramic bit
masonry bit
4
What is the purpose of a schematic drawing
<p>it shows the location of the site</p>
<p>shows the sequence of jobs</p>
<p>shows the size of the rooms</p>
<p>shows how a system works</p>
5
what 2 actions should be scarried out to protect a customers property?
lay dust sheets/use their hoover
boil the kettle/clean cups
lay dust sheets/remove valuables
lay dust sheets/remove all outer garments
6
what are the first and last stages to building a house?
setting out structure position, test and commision
fitting kitchen units and install roof structure
1st fix and test and commision
setting out the structure and 2nd fix electrics
7
What common faults could you come across when using a Junior hacksaw
loose head & damaged handle
Teeth missing
seized handle & low on chalk
Mushroomed head
8
State the name of the drawing.
manufacturers instructions
<p>site plan</p>
<p>schematic drawing</p>
scheme of works
9
Identify a fault that may occur on a power tool.
teeth are missing
incorrect bit
not connected to the internet
siezed chuck
10
what is this?
Site plan
schematic drawing
manufactorers instructions
work schedule
11
what regulation covers drilling and notching joists?
building regulations
socket regulations
electrical regulations
12
what is the procedure for using a 110v or 230v power tool
select PPE,safety checks, read manufacturers instructions
select PPE, driill the hole, turn off power
check cable, drill hole,add rawl plug
13
state 1 way to maintain a good working relationship?
resolve disputes
hide their tools
good communication
site meetings
14
what location would this fixing be used in?
mainly indoor use</p>
outdoor use</p>
hanging heavy objecyts</p>
15
what kind of location would you find this fixing
joists
wooden floors
masonry walls
printers
16
what material does this secure to?
play-doh
plasterboard
lego
brick
17
what is this?
round back wood screw
<p>round head wood scrrew</p>
flat head woodscrew
plasterboard fixing
18
what are the TWO main floor types in a domestic property?
brick and plasterboard
metal and wood
concrete and stone
solid/concrete floor-wooden flooring
19
State the name of the drawing.
<p>work schedule</p>
scale drawing
<p>risk assessment</p>
materials list
20
what are the first and last things to do when lifting floorboards?
check for pipes and nails/cross cut board
roll back carpetremove tongue and groove
roll back carpets/barrier open floor
roll back carpet/ de-nail board
21
what is this drawing called?
scale drawing
building drawing
a plan of a carpark
schematic drawing
22
what is this?
<p>self drilling screw</p>
self tapping screw
countersunk wood screw
brass srew
23
name a common danger when using electric tools
slipping over when wet
drowning
trip hazard
moving parts