What are the 3 indications of a leak?
Receipt Flow Decreases, Pressures increase, and Delivery Flow Decrease
Receipt Flow Decreases, Pressures Decrease, and Delivery Flow Decreases
Receipt Flow Increases, Pressures Decrease, and Delivery Flow Decreases
Receipt Flow Increases, Pressures Decrease, and Delivery Flow increases
2
Leak Rate is _________.
Flow in minus Flow Out
Flow out minus Flow in
FDIFF + VDIFF
the mass balance change of the pipeline volume
3
During an emergency evacuation of the POC, which pipelines are SD first?
Critical Operations
In order by Console number
Crude Systems
Products Systems
4
What is the purpose of tagging a point?
Allows information to be attached to points
Prevent a Controller from performing an unwanted task
All of the above
Provide reminders of exceptions
5
What does this graph represent?
Shutting down a line
Starting up a line
Leak Near Metering Station
Leak Near Booster Station in middle of the line
6
After editing a batch ticket in SCADA, what else needs to be edited?
Pending Ticket
CPM Transmitters
Log Reports
Active Ticket
7
Which of the following causes the control valve to control/throttle?
Horsepower Setpoint
All of the above
Flow Rate Setpoint
Discharge Setpoint
8
Where can a complete list of the roles and responsibilities of Controllers be found?
Fatigue Risk Management System (FRMS)
MPL POC Shift Change Process
POC Controller For Dummies
Control Room Management Plan (CRM)
9
In a Diesel fuel to Blendgrade gas cut, it is more important to protect the Blendgrade gas.
True
False
10
When selecting the Batch Bar in the Batch Tracking Overview, the popup will display only the batch you clicked on.
True
False
11
Which color EFS Events are generated by a flowing system?
White
Purple
Cyan
All of the above
12
During check-in, the Controller will need to check the Batch Legend's accuracy utilizing which of the following?
Balance on the Delivery Meter
Bbls pumped on the Receipt
Tickets from the Delivery Meter
All of the Above
13
Location of Business Continuity Plan/POC Emergency Evacuation Plan.
AKMS
Intelex
POC East SharePoint Page
POC Training Room
14
Which of the following is considered an AOC?
Mainline Pressure Relief Alarm due to field testing
Landowner requesting pipeline to be marked
Landowner calls to report sheen on water
API Change during switch from XUD to BCF
15
Anytime a status alarm or analog alarm is received, an AOC event is occurring.
False
True
16
A ___________ pressure loss trend on a Slack Line could indicate a possible integrity issue.
Shallow to Steep
Steep to Shallow
Positive
Flatlined
17
Jet Fuel should
never
contain any DRA.
True
False
18
________ alarms display the current state of all non-numerical points (state of device or text alarm)
Status
Emergency
Analog
Abnormal
19
When DOT Transmitter Testing is performed, we can leave the CPM transmitters in the model (no impact to VDIFF/FDIFF).
True
False
20
If a Controller needs to call in sick, who should they call first?
Training Specialist
MPL Doctor
POC Shift Specialist
POC Supervisor
21
_______: A specific amount of bbls of same product/crude type traveling through a pipeline together.
Interface
Slug
Hot Spot
Batch
22
When processing a schedule, the Active Ticket in the meters will update after Replacing or Appending the new schedule.
False
True
23
______: Any point that is assigned a numerical value such as PSI, API or BPH
Status Point
Analog Point
Setpoint
Weighted Average
24
When a batch is not verified properly which of the following could occur?
Create a new type of fuel
Cause a Leak Alarm
Pressure Relief Alarm
SCADA Communications will fail
25
FDIFF is _________.
EBITA
Flow out minus Flow in
the mass balance change of the pipeline volume
Flow in minus Flow Out
26
Receipt Flow=1500 BPH and Delivery Flow=1450 BPH. Which of the following is true?
VDIFF= +50
FDIFF= +50
FDIFF= -50
VDIFF= -50
27
There are four analog limit alarms: High-High, High, Low and Low-Low.
True
False
28
Increased lighting at night helps to prevent the desynchronizing of your circadian rhythm by simulating daylight.
False
True
29
If a field tech is needed for an operation and is not onsite within 30 minutes of the event, what must you do?
Initiate a SHS on the line
All of the above
Perform the event without them utilizing the field procedure
Shutdown the line until they arrive
30
________ is a colorless, flammable, extremely hazardous gas with a rotten egg smell.
H2S
HOS
HS2
HSS
31
Which alarm uses a mathematical algorithm over a specific time period to detect a change in an analog value.
ROC Alarm
CPM Disabled Alarm
Status Alarm
Limit Alarm
32
VDIFF is _________.
the mass balance change of the pipeline volume
Flow in minus Flow Out
Flow out minus Flow in
Volume, Distance, Income, and Future Failings
33
When a line becomes slack, Warning and Leak thresholds ______ in the model to account for uncertainty.
Stay the same
Decrease
Increase
Are removed
34
Which of the following could cause a tank deviation on an idle tank?
Leak
Storms (strong winds)
All of the Above
Large temperature changes
35
As part of the Resource Team, you (the Controller) must be in agreement before restarting a pipeline system.
False
True
36
Which agency establishes requirements for construction, testing, maintenance and accident reporting.
PHMSA
DOT
API
FERC
37
Why are pigs run through a pipeline system?
To clean a line
To push water that may be adhering to the pipe from the line
All of the above
To check pipe integrity
38
Which of the following is information that must be verified when verifying a batch?
Batch ID
Product/Crude Type
Batch Size
All of the Above
39
A device or remote is not communicating to the POC from the field; indicated by a orange background with "S"
Static
Stale
Status
Suppression
40
Which agency is responsible for governing pipelines through incident response training and control room management.
PHMSA
API
DOT
FERC
41
Field Personnel are authorized to open/close any valve they need for field work without communicating with the POC first
False
True
42
A device is not showing a normal status; indicated by a purple color.
Error
Off Scan
Test Mode
Manual
43
The data displayed in SCADA would be considered what on the Data Quality Ladder?
Inference
Opinion
Fact
Assumption
44
According to the CRM Plan, who has the authority to direct or supersede a Controller?
No One
Field Personnel
Hydraulics
POC Supervisor
45
What document details how the POC mitigates and manages fatigue of personnel?
Control Room Management Plan (CRM)
Fatigue Risk Management System (FRMS)
POC Training and Qualification Program
MPL POC Shift Change Process
46
The higher the API the ____ a product is.
Lighter
Heavier
Cleaner
Dirtier
47
Console Updates should always be looked at as part of your check in.
True
False
48
Which of the following ways can product/crude enter a sump?
Thermal Reliefs
Unit/Pump seals
Drain Lines
All of the above
49
When a unit starts, the pressure upstream decreases.
True
False
50
______ is the lowest temp at which liquid will form enough flammable vapor to ignite if there is an ignition source.
Boiling Point
Flash Point
RVP
Kent State Golden Flashes
51
__________: A device used to calibrate meters used in measuring oil and products.
Prover
Over and Short
Weighted Average
PLC
52
When making a Receipt tank switch from a less full tank to a fuller tank, the pressure/flow rate should decrease.
True
False
53
If the balance to go on the meter is
more
than the known upstream linefill amount, the incoming cut is early.
False
True
54
What is the purpose of the Shift Report/Daily Event Log?
Details problems/issues that occurred during your 12 hour shift
All of the above
Avoid sending problems to the appropriate areas
Details all operations that occurred during your 12 hour shift
55
A station DRA skid will disable _______ before a Jet/Kerosene batch arrives.
2 hours
at time of arrival
It doesn't disable
1 hour
56
The primary mustering location during an evacuation of the MPLX building is the Donnell building.
False
True
57
When changing a Suction or Discharge Setpoint in SCADA, which of the following is the default setpoint mode?
Throttle
Direct
Case Pressure
Stepped
58
During an evacuation, it is important to remember to shutdown your lines before leaving the POC.
False
True
59
This is the main location that houses information such as Shift Change Event Sheet and the Daily Event Log.
SCADA
POC East SharePoint
AKMS
MaCRoM
60
The Backup Pipeline Operations Center in located in ________.
Bluffton, OH - Kira's Flipside Grill
Bluffton, OH - CentraComm Building
Findlay, OH - Donnell Building
Findlay, OH - Hancock Hotel
61
When a unit starts, the pressure downstream increases.
False
True
62
What is the purpose of Control Checks?
Finds situations where operating devices could cause an operational problem
Ensure that shared devices are only used by one console at at time
Ensures that all devices are operated at least once every 24 hours
Prevent turning to the wrong location along the line.
63
A positive FDIFF within the CPM model would be caused directly by which of the following?
Receipt flow greater than Delivery flow
Receipt flow less than Delivery flow
Leak on Tank Valve
Leak at the Delivery Station
64
What does this graph represent?
Starting up a line
Leak Near Booster Station in middle of the line
Shutting down a line
Leak Near Metering Station
65
When the field is filling a pig trap, a CPM Alarm may be received because filling a pig trap simulates a leak.
True
False
66
_________: The ratio of the weight of a volume of any liquid to the weight of an equal volume of water.
Gravitometer
PSI
Barrel
Gravity (API)
67
Safety Related Alarms only need documented if they are real alarms; false alarms from field work do not need written up.
False
True
68
DRA Injection Enable/Disable commands are automatically generated by SCADA based on Batch Tracking.
True
False
69
DRA decreases system flowrates by increasing PSI along the line.
True
False
70
__________: SCADA
Supervisory Control and Data Administration
Standard Control and Data Administraiton
Standard Control and Data Acquisition
Supervisory Control and Data Acquisition
71
Logging into the SCADA System using the Viewer Account allows you to operate valves and start/stop as necessary.
False
True
72
_________: 42 US gallons at 60 degrees Fahrenheit and 0 PSI gauge
Tariff
Gravity
Barrel
Ton
73
Inhibit All Tags prevents commands from executing on the tagged point. The Inhibit All tag must be removed to operate.
True
False
74
______: DOT
Division of Transportation
Division of Transit
Department of Transportation
Department of Transit
75
Your old MF was 1.0020 and your new MF is 1.0015, how will the new factor impact your flow rate and bbl counts?
Both will decrease
Flow rate will increase, bbl count will decrease
Both will increase
Flow rate will decrease, bbl count will increase
76
All POC phone calls through the desktop phone are recorded.
True
False
77
Which of the following are situations where you would need to call your Scheduler?
Line is 6 hours behind schedule
Tanks won't work
All of the Above
Schedule is rejected
78
_____: DRA
Diameter Routing Agent
Data Recovery Agent
Design Risk Assessment
Drag Reducing Agent
79
With a Meter Head Switch, the Pending Ticket is
always
moved to the Active Ticket.
False
True
80
Which statements are true when it comes to Meter Head Switches?
All of the Above
Physical meter head is switched (A to B OR B to A)
Switches Sample Pots
Updates Weighted Averages
81
Which Proving concept represents the standard deviation based on the last 50 factors for a meter.
% Deviation Between Runs
Minimum Sigma Range
Maximum Sigma Range
Weighted Average
82
The longer the time averaging period, the more time it takes the dynamic threshold to adjust back to steady state.
True
False
83
For the most current prover run, what value must be considered to ensure consistency amongst runs?
Minimum Sigma Range
Prover Report
Weighted Average
% Deviation Between Runs
84
________: Located on the discharge side of the pump; used to regulate PSI and BPH on the pipeline by closing/opening
Discharge Pressure
Case Pressure
Throttle Pressure
Control Valve
85
If both VDIFF and FDIFF are positive, it is possible a leak is occurring on the system.
False
True
86
SCADA automatically prevents known alarms from being audible for a short amount of time during a transient condition
Test Mode
Inhibited
Alarm Shelving
Alarm Suppression
87
_______: A rate sheet of charges made by pipeline companies for moving oil.
Tariff
Barrel
Ticket
Over and Short
88
If comms are lost with only a Secondary PLC, manually connecting the site's Master PLC will regain comms via dial backup
True
False
89
On the Hydraulic Gradient, what does the cyan line indicate on the graphical display?
Actual/Passing Pressure
Current Pipe (Calculated) PSI
Elevation
Batches
90
If there is a SHS on a system, who tells the Controller that the SHS is cleared, and the system can be restarted?
POC Training Specialist
Local Area Supervisor
POC Specialist
All of the Above
91
________: The mixture which occurs in normal pipeline operations between batches having different specifications.
Interface
Slug
Batch
Hot Spot
92
Tank Available Stock includes
all
product in the tank,
including
tank bottoms.
True
False
93
When you are getting
less
barrels
out
of the pipeline than you are putting
in
, you are running a "Shortage."
False
True
94
If contacted by a reporter for a comment on an unintended release, how should you respond to them?
All of the Above
Contact Public Relations
Say No Comment
Contact On Call Supervisor
95
A device or alarm point that has been set to a certain state by the Controller; indicated by pink background with "M"
Test Mode
Operated Generated
Manual
Error
96
Field personnel will be aware of any haze or flash issues because all notes about them will appear on the schedule.
False
True
97
EMT-BCF-5863-YM is completed and we are now pumping EMT-BCF-5864-YM. Would you use a Print Ticket or Meter Head Switch?
Print Ticket
Meter Head Switch
98
Which statements are true when it comes to Print Tickets?
Moves Pending Ticket to Active Ticket
All of the Above
Resets POC Counter only
Resets Field and POC counters
99
If an upstream API reveals that the arrival of a cut will differ from the original ETA, the field must be notified.
True
False
100
Who is responsible for updating the SHS Documentation?
POC Project Specialist
POC Specialist
All of the Above
POC Supervisor