stud
bud
Sign up
Log in
Home
Library
Explore
SAT
More
Year 12 IPT Project Management. Flashcards | StudBud
Explore
/
Year 12 IPT Project Management.
Year 12 IPT Project Management.
20 terms
·
StudBud Administration
·
48 plays
Project management stuff.
Flashcards
20 cards
F
Practice quiz
P
Host live
L
Questions
20
Answers
1
Which of the following best describes
smtp
?
A protocol used for synchronising communications across a network.
A set of rules for securing communication between two computers.
A set of rules to securely transfer files across a network.
A protocol for electronic mail transmission.
2
Which project management tool can be used to inform team members how and when information will be distributed?
Scheduling of tasks
Diary to record dates of meetings.
Communication management plan.
Journal to record progress.
3
Required features, properties or behaviors in a system are called:
needs
capabilities
decisions
requirements
4
SDLC stands for:
System diagnosis lifespan continuim.
System development linear cylce.
System development life cycle.
Systematic Data limit control
5
Decision trees are:
Represent the rules, conditions and actions as a diagram
Are used by Arborists.
Represent a clear view of uncertainties in a system.
Represent the rules, conditions and actions as a table.
6
A report into how realistic and achievable a project is, is called a:
A Capability study
A scheduling study
Feasability study
An environmental impact study.
7
The study of the value of a project and its benefit opposed to another and its value is known as:
Long term projection analysis
Net profit margin
Net present value.
Cost benefit analysis
8
What is the Protocol
SSL
commonly used for ?
To receive and send files between computers on a network.
To establish an encrypted link between a web server and browser.
To establish connection between two computers on a network.
To receive and send email messages between a browser and server.
9
The point at which a systems cost has been offset by its profit.
Break even point.
Profit loss margin
Break through point.
profit loss incline
10
Customisation is:
All of them..
Creating tailor made solutions within an existing system.
Having a customer focus.
fine tuning the system for optimal performance.
11
What is the main function of a switch in a communication system?
It links two different types of networks.
It connects a network device to the network.
It enables network devices to talk to each other.
It links two identical networks.
12
Cost to benefit analysis is:
A study of the relationship of cost to benefit.
A study of financial constraints on the project.
A study of the profit margin generated by the project.
A study of the most feasable way to spend the money.
13
Which of the following error detection techniques is most effective in checking accuracy of Data transmitted?
Checksum
Parity bit
Cyclic redundancy check
Block character check
14
Which of the following is a transmission level protocol?
HTTP
Internet protocol.
Ethernet.
SMTP
15
The purpose of handshaking in a communication system is to:
transmit data between nodes.
Determine speed of Data transmission between nodes.
establish and negotiate communication between nodes.
Detect and correct errors between nodes.
16
Name the conversion technique
Phased conversion
Direct conversion
Parallel conversion
Pilot conversion
17
At which stage in the development of a new system would a project team determine how Data is to be converted?
Implementing
Planning
Testing Evaluating and maintaining.
Designing
18
Which hardware component is necessary to physically connect a client to a server?
Wireless access point.
Network interface card.
Repeater
Modem
19
A company has decided to replace its twisted pair cable with optic fibre. What would be the reason for this?
Faster data transmission
Better error correction.
Larger storage capacity
more reliable wireless connectivity.
20
Implementation plans are:
A plan to reduce waste and inefficiencies.
A plan about how a system is engaged.
A plan about how a system operates
A plan about how to reach profit quicker.