Leading SAFe - Lesson 5 Flashcards | StudBud
Explore
/
Leading SAFe - Lesson 5
Leading SAFe - Lesson 5
8 terms
·
StudBud Administration
·
172 plays
Sample test for SAFe Agilist
Flashcards
8 cards
F
Practice quiz
P
Host live
L
Questions
8
Answers
1
What is the primary goal of decentralised decision-making
Reduce Cost of Delay
Increase alignment
Minimise Work-in-Progress
Resolve Dependencies
2
What does SAFe Principle #3 "Assume variability; preserve options" enable?
Better economic results
Stronger Definition of Done
Up front design of systems
Specification traceability
3
What is the connection between feedback and optimum batch size?
Small batch sizes enable lower transaction costs
Feedback and batch size are generally not connected
Large batches reduce transaction costs & provide higher ROI
Lack of feedback contributes to higher holding cost
4
What is the primary purpose of Strategic Themes?
Drive incremental implementation across the enterprise
Define the sequence of steps used 2 deliver value 2 the cust
Connect the portfolio to the enterprise business strategy
Determine the order in which Epics should be executed
5
What should be directly funded to implement Lean-Agile budgeting?
Cost centres
Value Streams
Strategic Themes
Features
6
What Definition of Done is required for the Team Demo?
Program Increment
System Increment
Working System
Release
7
What is a result of shorter queue lengths
Less variabiltiy
Longer cycle times
Lower quality
Increased risk
8
Which statement is most accurate about the Solution/Product Vision
It expresses the strategic intent of the ART
It drives the allocation of budget for the ART
It provides an outline of the Features for the next 3 PIs
It summarises the team PI Objectives for the current PI