Which of the following is considered an internal threat?
Employees
Hackers
Bee hive in the vents
Flooding server room
2
In the physical topology design, what type on link needs to be set up to implement?
LAN
WAN
MAN
VLAN
3
What is a vulnerability?
potential loss of an asset
the actual damage to an asset
something being saved in the network
possibility of an asset being exploited
4
What does a BIA stand for?
Big Iguana Activator
Business in Action
Business Impact Analysis
Basic Integration Analysis
5
Which document would help you identify past network traffic?
Event Log
Network Diagram
Baseline
History Log
6
What is the most common security policy failure?
Failure to assign responsibilities
Lack of user awareness
Overlooked critical assets
Improperly outlined procedures
7
Human Resources performs background checks and drug screenings
False
True
8
The acceptable use policy lays out the rules for computer use
False
True
9
What do you want as a technician in the case of a disaster?
A policy in which you panic
Some sort of business continuity plan
A backup of everything hardware and software
A guide to summoning the reincarnation of Robb Tracy
10
Which of the following terms describe a test lab environment that does not require hardware?
Offsite virtual storage
NaaS
VLAN
Virtual Sandbox
11
Which of these are forms of volatile data?
Games
HD data
Traptics
RAM
12
The Code of Ethics is the set of rules of professionalism in the workplace
True
False
13
Which of the following documents would you update if there is a new place in place?
Policy
Configuration Documentation
Procedure
Change Documentation
14
The logical topology needs planning for what?
LAN
VLAN
WAN
MAN
15
What is the last step in the Design Process?
Design Physical Topology
Plane Authentication and Authorization Services
Design Logical Topology
Plan Network Services
16
Which business doc is a contract that defines terms between two parties?
Master service agreement
Statement of work
Memorandum of understanding
Interconnection security agreement
17
How many recommended steps for designing a network are there?
6
10
5
8
18
What does MTBF stand for?
BitCoin
Multiple trains before Friday
Mean time between failures
Measurable time before failure
19
What is a Baseline?
Identify specific configuration for a device
Keeps track of configuration on the network or devices
Snapshot of performance stats of the network or devices
sells Bitcoin
20
What is step one in the Design Process?
Conduct A Needs Assessment
Design Logical Topology
Select Hardware and Software
Plan Network Services
21
What is the leading cause of data theft?
Phishing
Vishing
USB drive
PM Punisher
22
What are the goals of the first responder?
Let CEO know
Hit it with a hammer
Alert authority
Contain damage & don't damage evidence
23
The last phase of a network design is what?
Player Authenticity and Authorization Systems
Plain Authentication and Authorization Systems
Authorizing Systems and Plain Authenticity
Plan Authentication and Authorization Systems
24
What is loss?
the vulnerability of an asset
The actual damage to an asset
potential damage of an asset
the likelihood of losing an asset
25
What does MTTR stand for?
Mean time to repair
Bitcoin
Measurable time to retain
National technological tracing racer
26
What is an asset?
something an organization values
email attachments
something an organization vowels
acceptable loss
27
Which component of a change config mgmt policy identifies the need for a purposed change?
Change request
Authorized downtime
Feasibility analysis
Rollback