stud
bud
Sign up
Log in
Home
Library
Explore
SAT
More
Block II Part II MATMAN Flashcards | StudBud
Explore
/
Block II Part II MATMAN
Block II Part II MATMAN
37 terms
·
StudBud Administration
·
24 plays
Imported from external platform
Flashcards
37 cards
F
Practice quiz
P
Host live
L
Questions
37
Answers
1
What activity code are EAID assets requisitioned through ILS-S?
Activity Code I
Activity Code E
Activity Code A
Activity Code P
2
Supply Points are reconciled Quarterly
True
False
3
Who serves as the primary contact with units managing repair cycle assets?
RCP
PSC
FCD
FSC
4
Which is a part for which the LRS requires a one-for-one trade?
Repair Cycle Asset
Items in DIFM status
Repair Cycle Process
Items with ERRCD XD/XF
5
The TRN will update both ___ on the item record and ___ on the repair cycle record
Demand Data and Repair Cycle Data
Supply Point and Number of demands
Supply Point and List of Requested Items
Repair Cycle Data and Demand Data
6
What reference must maintenance personnel use when installing or removing items from end items?
TO
NPPC
D
TCTO
7
What activity code indicates the item is not maintained on an authorized in-use detail?
Activity Code A
Activity Code I
Activity Code P
Activity Code E
8
Who’s serves as base equip. review and authorization activity and manages all base-level equip. Items, except vehicles?
EAE
LRS CC/APO
Property Custodians
Flight Service Center
9
Who provides overall management of base equipment?
Property Custodians
Flight Service Center
EAE
LRS CC/APO
10
What activity code identifies an unserviceable detail record?
R920IM
R920RW
R480RW
R480IM
11
Who acts as the turnaround processing point supporting organizations not supported by the MIS
TRN
LRS/Materiel Management Activity
FSC
Decentralized Material Support
12
What is the purpose of the Special Inventory Interrogation Input (1GP)?
Maintain the suspense notices file
Produce Special Inventory Count Output (SRCs)
Assign freeze code “G” to item and detail records
Assign freeze code “I” to item and detail records
13
TRIC FCD is utilized to create a supply point detail
False
True
14
What will the EAE utilize to identify what the equipment custodian is authorized and what they can obtain for their org.
FSM
FCD
CIR
CEMF
15
TCTO kits stock numbers are identified by what?
K in the 5th position
K in the 4th position
TCTO Flag
NPPC 4
16
What form will the maintenance activity provide to the TRN Manager for Data Processing?
AFTO Form 350 tag Part 1
AF Form 1991
AFTO Form 350 tag Part 2
AF Form 2005
17
TCTO Compliance will be identified in two ways, what are they?
TO Flag
NPPC 3
NPPC 4
TCTO Flag
18
Critical Information on the D23 will be ___, ___, and ___.
PBR
DIFM Status
DIFM Location
AWP
19
What TRIC and Act. Code is utilized when a demand is placed on the supply point and the item is available?
FSP and “S”
MSI and “S”
FCD and “S”
MSI and “C”
20
Stock control will send a written follow-up to the item manager if disposition instructions are not received in __ days
45
90
11
10
21
FSC uses the D23 to monitor AWP, Bits and Pieces, and status for end items
True
False
22
Who is responsible for the repair cycle process?
LRS CC/FSC
LRS CC/APO
LRS CC/VPO
LRS CC/PHD
23
Who may be held financially responsible for equipment if it becomes lost, damaged, or destroyed?
Property Custodians
LRS/ Materiel Management Act.
Deployed Property Custodians
EAE
24
What is the method in which complete inventories will only be accomplished?
Open Warehouse Method
Closed Warehouse Inventory
Closed Warehouse Method
Complete Warehouse Method
25
The DIFM Mgmt Quarterly Reconciliation ensures maint. Physically has all items listed on the D23
False
True
26
What MGT notice indicates the successful processing of a Turnaround Action?
I122
I123
I233
I112
27
Supply Points are an extension of the LRS Warehouse stock and allow pre-requisitioning of assets
True
False
28
What are replacement parts called?
Base Repair Items
Repair Cycle Assets
Bits and Pieces
Supply Points
29
What will occur with the organizations remaining accountable in-use equip. to ensure it is on hand?
Spot Check 100%
Spot check 25%
Spot check 15%
Spot Check 10%
30
What TRIC is utilized to create a supply point detail?
FSC
MSI
FCD
FSP
31
What style of inventory will the property custodian perform when reviewing the CIR?
Eye to Book
Floor to book
Floor to Form
Book to floor
32
Who ensures ERRCD NF/ND items are accounted for on authorized/in-use detail records?
Property Custodians
EAE
LRS CC/APO
LRS/Materiel Mgmt Activity
33
Who will establish an inventory schedule by the fiscal year?
Inspection Section
Physical Inventory Control Section
LRS CC/APO
Maintenance
34
How often are supply points reconciled?
Semi-Annually
Quarterly
Each Fiscal Year
Daily
35
Once the DIFM Quarterly Reconciliation is complete FSC Personnel will complete a final report within __ days
10
5
12
11
36
What section assigns and controls freeze code C?
Physical Inventory Control Section
Inspection Section
Special Inventory Section
Maintenance Section
37
FSC uses the D23 to monitor DIFM Status and maintain visibility of issued assets controlled by maintenance
False
True