CPIM 2, 7.0, Mod 6 Sect A, B, C Flashcards | StudBud
Explore
/
CPIM 2, 7.0, Mod 6 Sect A, B, C
CPIM 2, 7.0, Mod 6 Sect A, B, C
11 terms
·
StudBud Administration
·
241 plays
Imported from external platform
Flashcards
11 cards
F
Practice quiz
P
Host live
L
Questions
11
Answers
1
Buffers can be time or material used to support throughput
False
True
2
The purpose of Dispatching is to:
Control load
Prioritize load
Set product cost
Indicate defective product
3
In TOC, the rope is used to coordinate release of material to the gateway work center
True
False
4
A method used to level production throughout the supply chain:
Hoshin
Horizontal loading
Holistic thinking
Heijunka
5
Disadvantages of Functional Layouts include all except:
High Queue time
High equipment flexibility
High WIP
Bottleneck
6
"Setting the pace of production to match rate of customer demand" is the definition of :
Time Fence
Throughput
TOC
Takt Time
7
Make to Order Products traditionally use a Continuous Flow Process
True
False
8
Engineer to Order Products are typically made in which Process Type?
Fixed Position
Continuous
Batch
Line
9
If the Critical Ratio is more than 1, the job is behind schedule
False
True
10
The longest element of lead time is often:
Wait
Move
Queue
Set up
11
In a Flow environment the layout is based on the product
True
False