Med gas quiz 10 part 1 Flashcards | StudBud
Explore
/
Med gas quiz 10 part 1
Med gas quiz 10 part 1
25 terms
·
StudBud Administration
·
386 plays
Imported from external platform
Flashcards
25 cards
F
Practice quiz
P
Host live
L
Questions
25
Answers
1
Area alarms shall be tested to verify the warning signals for all vital life support and critical care areas if the
20%
40%
60%
10%
2
Persons maintaining medical gas and vacuum systems shall have appropriate qualification by demonstrated one of the…
A documented training program acceptable by the health care facility
Credentialing to ASSE 6030, technically competent
Credentialing to ASSE 6040, technically competent
All of the above
3
Instrument air sources shall produce air at not less than a gauge pressure of___.
200 psi
50 psi
100 psi
250 psi
4
Breached portions of the systems subject to inspection and testing shall be confined to only the specific altered zone
Any of the above
Replacement or addition of system components
System component removal
Physical separation of pipeline
5
Instrument air systems shall activate the alarm systems when the dew point at system pressure exceeds___.
-20F
-22F
22F
-26F
6
The 24 hour standing pressure test shall be witnessed by the AHJ or its____.
Doctors
Staff
Designee
Verifier
7
Inspection and testing shall be performed on all new piped gas systems, additions, renovations, temporary installation
Have two years experience
Have a documented procedure
Be a certified tester
None of the above
8
In category 2 piped gas or piped vacuum systems shall be permitted to administrate moderate sedation, minimal sedation
Category 2
Category 1
Category 4
Category 3
9
During the initial pressure test, the source shutoff valve shall remain closed and the test pressure for pressure gases
150 psi
75 psi
200 psi
100 psi
10
Intake air for instrument air compressors shall be permitted to be drawn from what location?
Equipment location
Outside
Any of the above
Ducted air
11
Final line filters for instrument air shall be rated for a minimum___efficiency at___micron.
98% at .01
100% at .01
98% at .1
100% at .1
12
Installer shall create a form indicating that the standing pressure test has been performed and witnessed, a copy shall
Verifier
Any of the above
Doctors
Nurses
13
Before the piping system is put into use, who is responsible for the ascertaining that the gas delivered to outlet/inlet
Facility authority
Installers
Any of the above
Maintenance staff
14
Alarm panels and shutoff valves labeling shall be__when modifications are made, changing the areas serviced.
Yearly
Updated
Backdated
Monthly
15
At the sample port a demand of approximated 25% percent load shall be created to cause the compressors to cycle on
12.0 hours
10 hours
12.5 hours
24 hours
16
After a final tie-In on an active vacuum system, each vacuum joints shall be tested with a__leak detector or other means
A tracer gas
Vacuum gauge
Pressure gauge
Ultrasonic
17
After the piping system, blow down test shall be done. Then the Installer must perform which of the following test?
Initial piping purge test
Initial pressure test
Initial cross connection
All of the above
18
The air quality tests shall be conducted after the medical air source system has been operation normally, but with the
12.0 hours
24 hours
10 hours
12.5 hours
19
Instrument Air system that employ a standby header shall be permitted to have a simplex cooler and dryer. Where a
Check valve
Isolation valve
Two way check valve
One way valve
20
Medical air purity for compressor systems shall be analyzed prior to the source valve being opened. Samples taken at the
2 ppm
25 ppm
10 ppm
500 ppm
21
Nitrogen and instrument air supply systems are not to be used for patient care, but are used for powering pneumatic
Medical
Hazardous
Support
All of the above
22
After the final Tie-in each joint shall be leak tested by the source gas. New work and the existing system at the normal
Freon
Ammonia
Chlorine
Acetone
23
Distribution piping for support gas systems(nitrogen and instrument air) shall be__type “L” copper tube.
Any of the above
ASTM B280
ASTM B819
ASTM B88
24
Initial piping purge test the installer shall use the appropriate adapters and purge with an intermittent high volume
No white coloration
No yellow grit
No discoloration
No yellow dust
25
Support gases system are subject to the same hazards as, present in any piped medical gas system with additional hazard
More highly explosive
Elevated pressures
Asphyxiations
Hazards are no different than any other piped medical gas