MGT 101 Exam 2 Review Part 1 Flashcards | StudBud
Explore
/
MGT 101 Exam 2 Review Part 1
MGT 101 Exam 2 Review Part 1
100 terms
·
StudBud Administration
·
36 plays
Imported from external platform
Flashcards
100 cards
F
Practice quiz
P
Host live
L
Questions
100
Answers
1
What is
not
an example of Real Property or Real Property Installed Equipment.
The HVAC system
Concrete pad
Office chairs
Fire suppression system
2
Which is
not
part of the project development phase?
Approval
Project Record
Economic Analysis
Documentation
3
Which is
not
part of the programming phase?
Determining fund source
Selecting program avenue
Facilities Board
Classifing work
4
Installing transformer with reducing energy efficiency. $1000 in the first yr and will increase 3% each yr. What cost?
Geometric Gradient Cost
Future Cost
Arithmetic Gradient Cost
Annual Cost
5
The UMMC limit is $4.0M x ACF NTE $14M. Anything over this amount is classified as construction and includes MILCON.
True
False
6
Which of the following situations requires an economic analysis?
Replace roof on pole barn (repair project) at $500k. FRV = $600k.
Install a temp. shelter for gym function while gym is renovated. No FRV.
Construct new compressed gas storage facility (construction) at $1M.
Renovate with headquarters (repair) at $7.8M. FRV = 15M.
7
Which is a formal requirement?
Shop Input
Neighbors
Wing/Group/Squadron Leadership
Good Idea Fairies
8
Private Commercial Entities use APF.
True
False
9
For remote and isolated bases routine maintenance of golf course grounds is payed for by APF.
False
True
10
Which Condition Indices method is a subjective rating of condition with "stop-light" type grading? Less accurate, faster
Direct Rating
Condition Analysis
Distress Survey
Age Based
11
Which Tableau Dashboard is this?
System Degradation
Work Task
Manpower and Personnel
Data Confidence
12
What is the NexGenIT record of a "request"?
Work Task (WT)
Service Request (SR)
Work Request (WR)
Schedule Task (ST)
13
The most common activity relationship is:
Start to start
Finish to Start
Start to Finish
Finish to Finish
14
Work management is the cradle-to-grave processing of work requests.
False
True
15
Tableau can provide the user with new information about their data set?
True
False
16
The Activity Management Plan is project-based while the Comprehensive Asset Management Plan is requirements-based.
True
False
17
The critical path is:
Irrelevant to schedule analysis
The sequence of activities that have zero float
Allocation of resources needed in the last week of the project
18
Work classification to demolish pole-barn not associated with any other work on site? <75%
R&M Repair
Maintenance
No Class Work
Minor Construction
19
An Opportunity is used by CEN to conduct the programming actions (scoring, prioritization, coordination, DD 1391).
False
True
20
R&O helps the Ops Flt focus on proactive systems performance analysis, resource optimization, & lifecycle reqmt planning
False
True
21
Minor construction includes O&M construction (UMC) and UMMC/P-341 Construction.
True
False
22
What is Activity Management?
The process of maintaining physical fitness through structured workouts.
The practice of organizing daily schedules to improve productivity.
The process of developing an investment strategy for a portfolio of assets.
A method for analyzing consumer behavior for CE data collection.
23
Program avenue for building a smoothie & juice bar inside base fitness center? <75%
MILCON
UMMC
NAF
O&M
24
The intent of the R&O section was to shift the Operations Flight from being proactive to reactive.
True
False
25
Excluded costs and unfunded costs are considered to be no work classification
True
False
26
Which activity category does the golf course fall under?
CAT A
CAT C
IDK
CAT B
27
Fill in: Programming is the process of ___ and acquiring both the ___ and the ___ necessary to accomplish planned work.
coding; authority; technical expertise;
defining requirements; knowledge; leadership
documenting requirements; authority; resources
managing projects; funds; resources
28
Project splitting to reduce costs below an approval threshold is OKAY.
True
False
29
Which is
part of the Activity Manager's focus areas?
Snack bar
Physical fitness
Synchronization
Airplanes
30
The material issued to the workgroup(people/shop) is a direct cost.
True
False
31
What would
not
be considered functionally unique?
Replacing ornate bathroom fixtures
Repairing a riding stable
Resurfacing bowling lanes
Replacing worn-out normal quality carpet
32
Can Relocatable Facilities be funded by AFCAMP?
No
Yes
Yes if used as swing space associated with AFCAMP project
Idk
33
Which is an example of direct time?
Physical training
Preventive maintenance
CBRN training
Supervision
34
Work classification of replacing a worn-out flat roof system with a more energy efficient pitched roof system? <75%
Sustainment Repair
R&M Repair
Maintenance
Minor Construction
35
The Parametric Cost (Assemblies) Estimate is +50%,-30%.
False
True
36
Which Tableau Dashboard is this?
System Degradation
Data Confidence
Work Task
Manpower and Personnel
37
If a proposed action is determined to be categorically excluded (CATEX), an Environmental Assessment must occur.
False
True
38
Classification of work to install a new addition to the base education center, enlarging the facility? >75%
Sustainment Repair
Maintenance
R&M Repair
Minor construction
39
Program avenue for replacing a spray paint booth in an Aircraft Corrosion Control Hangar? Funded cost: $4M; FRV: $5.1M
MILCON
NAF
O&M
UMMC
40
CAT B are revenue generating activities while CAT C are basic community activities.
False
True
41
For a facility project to be complete and usable it needs to...
be dependently usable.
be completed in a single undertaking with a specific beginning and end.
meet at least one established requirement.
meet most applicable codes.
42
Work classification of reseeding an embankment along the main base road to prevent erosion? <75%
Minor Construction
R&M Repair
Sustainment Repair
Maintenance
43
The Activity Manager defines, measures and balances performance metrics to maximize value.
False
True
44
Program avenue for a project to remove aircraft rubber deposits from the runway? <75%
UMMC
NAF
O&M
MILCON
45
CAT A are mission sustaining activities.
False
True
46
If multiple EEIC Project the base decision for funding responsibility is based on predominant EEIC.
True
False
47
The Project Comparison (Order of Magnitude) Estimate's degree of accuracy is +20%,-15%
True
False
48
Mission facilities use NAF (private funds).
False
True
49
When estimating an activity duration what should you assume?
The activity duration based on when you need to complete the project
Normal level of resources and working hours
You will have all the extra resources you need
Overtime is a standard practice
50
Identify priority: The COMM squad lost electrical power to its main server room that provides COMMS for the entire base.
4
3
2
1
51
Which Tableau Dashboard is this?
Data Confidence
System Degradation
Manpower and Personnel
Work Task
52
Which is an informal requirement?
Preventative Maintenance Task Lists
Facility Condition Assessment Team (FCAT)
Friends
Engineering Flight
53
Who in the Civil Engineer Squadron is responsible for evaluating investment decisions based on life-cycle costs?
Operations Engineering
Installation Master Planners
Programmers and Project Engineers
Everyone with a role in supporting or making investment decisions.
54
A repair costs $1.2M & its Estimated Replacement Value is calculated to be $1.4M. It is okay to proceed with the repair.
False
True
55
Which is a criteria to waive an economic analysis?
Urgent project to correct problems or violations involving health or safety
You don't feel like it
Your commander said it was a waste of time
You have a tight deadline
56
Basing Actions (bed-downs) are AFCAMP eligible?
True
False
57
SABER and MACC are both IDIQ type contacts.
True
False
58
How often are Air Force facility assessments required?
Every year
Every 5 years
Every 2 years
Every 6 months
59
What is
not
a purpose of an economic analysis?
To aid decision maker judgement
To waste everyone's time
To be a decision tool
To help weigh the costs, benefits, risks
60
If a bowling center has 16 lanes or less what activity category does it fall under?
CAT B
Idk
CAT C
CAT A
61
The concept of "Time Value of Money" means what?
If I max out my TSP someday I'll be a millionaire.
A million dollars is equivalent across the term of analysis.
A million dollars will buy less in the future than it does today.
A million dollars will buy more in the future than it does today.
62
Classification of the work to replace an aged & worn-out main ventilation unit in an aircraft hangar? <75%
Sustainment Repair
Maintenance
R&M Repair
Minor Construction
63
Identify priority: Fitness Center FM is requesting help from the electric shop to fix some of their broken treadmills.
Not my problem
4
3
1
64
Identify priority: I'd like my carpet to be replaced in my office (current carpet is serviceable and has no wear/damage)
4
3
Not my problem
2
65
The Quantity Takeoff (Unit Price) Cost Estimate's degree of accuracy is +10%,-5%.
True
False
66
The Age Based Facility Condition Assessment method is a replacement for a true assessment
True
False
67
Identify priority: In a deployed environment the wing commander calls CE about a dog wandering around on camp.
3
1
2
Not my problem
68
Which is
not
part of Asset Management Principles?
Planning works to minimize lifecycle costs and risks of ownership
Developing project funding priorities based on consistent methodology
Planning works to minimize long-term benefits to mission accomplishment
Decisions are aligned with core mission requirements
69
Identify priority: My Aerospace Ground Equipment is not working properly. Need power production to come look at it.
Not my problem
1
2
3
70
Identify priority: The FSS requests an additional storage room to be constructed in the FSS headquarters facility.
1
3
2
4
71
What activity category is the fitness center?
Idk
CAT B
CAT A
CAT C
72
To compete for centralized funding through AFCAMP only items in the scope of work need to be assessed in SMS BUILDER.
True
False
73
Identify priority: My parking lot is full of potholes!!
2
1
3
4
74
Work classification to install new fire system detectors for a computer server room? No expansion; all interior. <75%
R&M Repair
Maintenance
Sustainment Repair
Minor Construction
75
With multiple work classifications the lowest cost threshold drives project approval.
False
True
76
Replacing chiller. It will last 5 yr but need to replace compressor at 2. It will cost $5000. What kind of cost for NPV?
Annual Cost
Geometric Gradient Cost
Future Cost
Arithmetic Gradient Cost
77
When is project justification based on economic analysis
not
required?
Construction cost >$2M
Repair cost >$2M and <75% of estimated replacement cost
All interim relocatable (Temporary) Facilities
Project justification is economic (e.g. energy projects)
78
Which is
not
part of the planning phase?
Develop cost
Develop and evaluate alternative solutions
Classify work
Identify requirements
79
Which delivery type is
not
used by the Air Force?
Construction Management at Risk
Design-Build
Design-Bid-Build
80
You are replacing a system for a new one w/ a life span of 15 yr. There are costs at yr 5. What is the term of analysis?
5 years
10 years
20 years
15 years
81
What is the percent of work time on average you can get after supervision, leave, training, etc. is taken out?
Deployable Work Hour Balance Rate (DWHBR)
Turning the Wrench Rate (TWR)
Manpower Rate (MR)
Availability Rate (AR)
82
Which is
not
an example of an Enterprise Priority Allotment?
Energy Savings Projects
Third Party Funded
Troop Training Projects (RED HORSE & CTS)
An unsound business practice
83
Project planning is the strategy and analysis which results in a built infrastructure requirement.
False
True
84
Which document provides space criteria in conjunction with standard design guides which help define functional space?
DAFMAN 32-1084
OPM - Freeze the Footprint
National Strategy for Efficient use of Real Property
20/20 by 2020
85
The Square Foot/Square Meter Estimate's degree of accuracy is +30%, -20%.
True
False
86
Which is
not
a contract used by the Air Force?
Fixed Price Incentive
Firm Fixed Price
Fixed Reimbursement
Cost Reimbursement
87
Which Tableau Dashboard is this?
Manpower and Personnel
System Degradation
Work Task
Data Confidence
88
Which is
not
a source used to determine project scope and requirements?
Activity Management Plans (AMP)
Condition surveys (pavements, roofs, etc.)
Your mom
Installation Development Plans (IDP)
89
Identify priority: Reoccurring maintenance - air filters in the building HVAC systems need to be replaced.
2
4
1
3
90
What can you
not
do with data analysis?
Build on known information
Look for patterns/trends
Fly an airplane
Create models
91
Which Condition Indices method is a detailed quantification of condition? This method is accurate but time consuming.
Distress Survey
Direct Rating
Condition Analysis
Age Based
92
The Utilities activity sits within the Engineering Flight.
True
False
93
The Airfield & Transportation Networks activity sits within the Operations Flight.
False
True
94
In the planning phase which is
not
an area for evaluation?
Environmental
Facility Optimization (space)
Life-cycle costs
What you ate for breakfast
95
An alt. to fix a runway deficiency is to demolish & replace it. The project will cost 1/3 of entire AF budget. Fails?
Feasible
Distinguishable
Suitable
Acceptable
96
If a project exceeds 75% of the estimated replacement cost it must be replaced, descoped, or approved to exceed 75%.
False
True
97
Identify priority: Operating the power plant on base (continual operations and maintenance).
4
1
3
2
98
What is the first step in the economic analysis process?
Benefit Analysis
Sensitivity Analysis
Idk
Define objective (success in terms of mission)
99
Which is an activity that sits within the Installation Management flight?
Utilities
Real Estate & Natural Infrastructure
Facilities
Airfield & Transportation Networks
100
Which would
not
be a Work Task?
Emergencies
Enhancement <$5k, <50 man-hours
Enhancement >$5k, >50 man-hours
Preventive maintenance