stud
bud
Sign up
Log in
Home
Library
Explore
SAT
More
FY22 Block 4 Unit 7* Flashcards | StudBud
Explore
/
FY22 Block 4 Unit 7*
FY22 Block 4 Unit 7*
61 terms
·
StudBud Administration
·
376 plays
Imported from external platform
Flashcards
61 cards
F
Practice quiz
P
Host live
L
Questions
61
Answers
1
The 4 mobilization facilitators are ACC, AFGSC, _, and AMC.
AFSOC
AFMC
AFRC
AETC
2
The _ is a function that is strictly responsible for all personnel deployment actions.
CDF
IDRC
DCC
PDF
3
The IDO/Log Plans review & monitor _ & verify receipt, acceptance or shortfall of taskings.
Applicable Newsgroups
None of the above
All of the above
DCAPES PIDs
4
What is the final inspection with the owning unit & joint inspector before load is accepted?
Load Plan
In-Check
Manifest
JI
5
Who will activate CDF work centers?
Wing Commander
LRS Commander
Log Planners
IDO
6
What is the orderly assembly of cargo in load plan sequence by chalk?
In-Check
Marshalling
Load Plan
Assemble cargo at Units
7
What is contingency planning NOT based on?
Climate & terrain of AOR
Current Events in the AOR
Intelligence
Strategic Planning
8
What is the first step in cargo processing?
Assemble cargo at Units
Load Cargo
Load Plan
JI
9
The change log will show changes that have occurred within a specific schedule.
True
False
10
Which RSO&I function includes receiving and clearing personnel and/or material through the POD?
Reception
Integration
Onward Movement
Staging
11
UDCC must be staffed with at least _ trained UDM's in order to mainain _ hour operations.
2; 12
2; 24
3; 24
1; 12
12
Which RSO&I function is the synchronized transfer of mission ready forces into the CCDRs force?
Integration
Reception
Staging
Onward Movement
13
Which LOGMOD component allows the Wg admin to have visibility over all organizations in the Wg?
LOGFOR
Tools
Personnel
Admin
14
If cargo fails the in check or JI, it will be considered _.
Frustrated
Failed
Unlcear for Air Transport
Rejected
15
Which is not a basic function in the LOGMOD recycle bin?
Clear
Restore
Purge
Delete
16
The IDRC and DCC are the focal point for _.
All Deployment Operations
Cargo Processing Operations
Personnel Processing Operations
Transportation Control Operations
17
Where is the best place to look for info if you have forgot how to accomplish a LOGMOD task?
LOGMOD Help Window
Reporting Instructions
Google
LOGMOD User Guide
18
What import file provides the scheduler and UDM with the deploying personnel requirements?
Plan Detail File
None of the above
PIF
LVY
19
Who is responsible for transitioning arriving pers/material into capable forces?
Supported CCDR
Supporting CCDR
Deployed Unit
Home Station Unit
20
What provides the user with the contents of an increment, down to the item level detail?
Cargo File
Load List
Packing List
Material List
21
Which table lines up specific events that need to happen for a specific type of mode of trans?
Events
Modes
Transportation/Tasks
Mode/Events
22
The goal of ________ is rapid development & execution of an OPORD based on a real world crisis or emergency.
Future Planning
Current Planning
Crisis Action Planning
Contingency Planning
23
DCC ___ are the SME's trained to execute deployment actions related to their specfic functions.
None of the above
Log Planners
Security Reps
Functional Area Representatives
24
APEX system is a system of _.
All of the above
Joint Policies
Reporting Structures
Processes, Procedures
25
Which LOGMOD role manages/approves/disapproves Pilot/Non-Pilot unit UTCS in LOGPLAN & LOGFOR?
Planner Role
Master Role
UDM Role
Admin Role
26
Who is normally responsible for surface movements?
USAF
Army
Marines
Navy
27
What is the CDF NOT responsible for?
Receive & In-Check Cargo
Process & Brief Passengers
Inspect & Marshal Cargo
Load Plan & Load Cargo
28
The ______ provides direction & coordination of reception & beddown procedures for arriving personnel and/or material?
Contingency C2 Planning Cell
Reception Control Center (RCC)
Both RCC/DCC
Deployment Controll Center (DCC)
29
Contingency Planning begins with a risk and vulnerability assessment that include:
Identifying the processes & resources for achieving goals
Identifying and prioritizing potential threats
Analyzing the humanitarian impact & devising plans & goals
All of the above
30
Where can a user open, save, or delete any report that they have generated?
Recycle Bin
Export Queue
Report Queue
Report Log
31
All DCC personnel require a security clearance at the minimum of which level?
Confidential
Secret
CUI
Top Secret
32
AP is accomplished through what system?
JOPES
DCAPES
LOGMOD
APEX system
33
Who provides maintenance support for fighters while enroute to/from their deployment locations?
ADVON
RAT
Follow On
EST
34
Which LOGMOD file provides the information necessary for CMOS/GATES to produce cargo manifests?
TCN Detail File Export
DRMD
Material List
Schedule Pprocessing Recap
35
_ provides a responsive, user friendly system for deployment planning and C2 for Log Planners?
ICODES
LOGMOD
CMOS/GATES
SMS
36
Which RSOI function includes moving forces and/or material to home or demobilization stations?
Staging
Onward Movement
Integration
Reception
37
In LOGMOD, what is used to execute all cargo and personnel that need to be processed and deployed?
Plan
Itinerary
Schedule
Mode/Events Table
38
At wing/installation level, Log Planners will work in which office?
IPR
PDF
Plans and Integration Office
CDF
39
Primary responsibilities of the ADVON team are _.
Developing employment reception & bed down
Execution of Unit Employment
Preparation
All of the above
40
Where do Log Planners accomplish basic responsibilities during redeployments?
DCC
IDRC
RCC
Contingency C2 Planning Cell
41
Who may stand up key work centers such as DCC,CDF, PDF, UDCC?
Log Planners
IDO
Wing Commander
LRS Commander
42
Which type of mobilization requirements are GFMAP requirement needed on a recurring basis?
Preplanned
Emergent
Institutional
Rotational
43
Who will be responsible for reception functions at austere operating sites until a RCC is est.?
Log Planners
Contingency Response Group (CRG)
Unit Commanders
Personnel
44
Which file is used to pass filled levy positions back to DCAPES?
DCAPES Chalk Export
TCN Detail File
DRMD
DCAPES Schedule Export
45
_ is the Wg's last check ensuring all pers are eligible, waivered, or replaced when ineligible.
UDCC
CDF
PDF
DCC
46
Which LOGMOD component is used to maintain LOGDET UTC data?
Tools
LOGFOR
Admin
Exports
47
Contingency Planning involves working _ of a crisis situation.
After
Ahead
During
None of the above
48
When cargo or personnel work centers are activated the IDRC becomes the _.
Deployment Control Center (DCC)
Crisis Action Team (CAT)
Total Deployment Function (TDF)
Installation Personnel Readiness (IPR)
49
What characterizes and distinguishes CAP from contingency planning?
Slow Reaction
Proactive Planning
Quick Reaction
None of the above
50
A National Guard or Reserve member can only be mobilized IAW legal authorities specified in Title ____ USC.
20
5
10
30
51
Which role manages & monitors unit deployment ops to include pers readiness tables & records?
UDM Role
Planner Role
Scheduler Role
Admin Role
52
Which file is used to pass PLANNING level data to other LOGMOD users or to be used as archive?
Plan Detail File
DCAPES Plan Export
Plan Transfer
Load Plan Detail
53
What provides the user with the contents of an increment, down to the suffix-item level detail?
Cargo File
Packing List
Material List
Load List
54
_ is responsible for accomplishing deployment activities at the unit level when activated.
CDF
DCC
PDF
UDCC
55
Which is any action that needs to be monitored for time in order to accomplish a specific task?
Events
Modes
None of the Above
All of the above
56
Who serves as the installations focal point for monitoring personnel processing activities?
IDRC
DCC
PDF
CDF
57
Which is not a overarching principle of RSO&I?
Unity of Command
Continuity of Transfer
Synchronization
Balance
58
Which overarching principle ensures unity of effort under 1 responsible CC for every objective?
Unity of Command
Continuity of Transfer
Synchronization
Balance
59
A team of members deployed in advance to coordinate requirements at the deployed location.
EST
Follow On
ADVON
RAT
60
What is a systematic on-demand creation & revision of executable plans with up-to-date options?
Crisis Action Planning (CAP)
Adaptive Planning (AP)
Contingency Planning
All of the above
61
Who assists the deployed CC in accomplishing 100% accountability of deployed personnel forces?
PERSCO
Log Planners
IPR
UDM