NFPA 99 2021 Study Guide
1 / 64
After completion of installer tests, which of these methods is permitted by code to test for cross connections?
A
None of the above
B
Pressure differential under the oversight of the AHJ
C
Individual pressurization only
D
Individual pressurization and pressure differential
Next