stud
bud
Sign up
Log in
Home
Library
Explore
SAT
More
Water Supply Review Flashcards | StudBud
Explore
/
Water Supply Review
Water Supply Review
30 terms
·
StudBud Administration
·
784 plays
#UA #watersupply
Flashcards
30 cards
F
Practice quiz
P
Host live
L
Questions
30
Answers
1
atmospheric vacuum breaker must be installed with the C-L a min. of __" above the overflow rim
1
2
12
6
2
A gravity feed system is significantly more expensive than a forced pressure system.
False
True
3
A control valve is required at each water-supplied piece of mechanical equipment.
False
True
4
Relief valves should be tested ___.
quarterly
monthly
daily
annually
5
A(n) ___ water heater is a nonstorage water heater that heats and dispenses water at the point of use.
instantaneous
solar-energy
combination
full-floating
6
Pressure according to the height of a liquid is called ___.
head pressure
volume
velocity
water pressure
7
backflow prevention assembly less than 5' from the floor must be provided a permanent platform.
True
False
8
Schedule 40 PVC pipe and fittings are ___.
red
green
purple
white
9
The most commonly used types of insulation for hot water piping is fibrous glass and flexible tubing insulation.
False
True
10
Pipe size normally is specified by two indicators: ___ and schedule.
pipe system layout
branch layout
developed length
nominal pipe size (NPS)
11
The term aqueduct or water bridge applies to any bridge or viaduct that transports water across a hollow or valley.
False
True
12
To offset power use and water demand times, water storage areas should be filled ___.
at night
at day time
13
Airgap separation must always be a minimum of ___".
1/2
1
3/8
3/4
14
Turbidity is a measure of the acidity of a liquid.
False
True
15
Gate valves are used to isolate main distribution lines, trunk lines, and branch lines.
True
False
16
An increase in the volume of water produced by thermal expansion creates a rise in _______.
friction
pressure
pollution
flow rate
17
Protection against vacuum conditions within a water heater is required by plumbing codes.
False
True
18
A dead end piping network is sometimes called a tree network.
True
False
19
Trench boxes are used for stable or unstable soil.
False
True
20
Heating potable water for domestic purposes, as bathing & cleaning is a relatively new practice
False
True
21
_______ pressure is the pressure available under full flow conditions.
Residual
Static
Minimum
Head
22
maximum water pressure in a building water supply system is 150 psi.
False
True
23
Reclaimed water is most commonly used as ___ water.
irrigation
fire-sprinkler
drinking
fountain
24
Velocity in a water supply system is affected by the demand at the point of use, the capacity of the supply system
False
True
25
PE-AL-PE pipe 1/2" to 1" should have horizontal above ground supports at ___" intervals.
12"
52"
36"
98"
26
A water inlet tube inside a water storage tank or reservoir to convey the incoming water to or near the bottom of tank
heat trap
fill tube
dip tube
relief discharge pipe
27
A ___ valve consists of a rotating disc that seats against a resilient material within the valve body.
butterfly
globe
gate
check
28
The manufacture of nominal pipe sizes from 1/8" to 12" is based on the outside diameter of pipe
False
True
29
The ___ is the pipe segment from the meter to the first tee in the system and is sized using the total demand WSFUs.
fixture demand
multi port tee
building supply
pipe segment
30
___ water is wastewater from fixtures that comes in contact with or contains fecal matter or food solids.
Storm
Black
Gray
Reclaimed