stud
bud
Sign up
Log in
Home
Library
Explore
SAT
More
ALE AREA A Flashcards | StudBud
Explore
/
ALE AREA A
ALE AREA A
100 terms
·
StudBud Administration
·
87 plays
HISTORY THEORY PROFFESIONAL PRACTICE
Flashcards
100 cards
F
Practice quiz
P
Host live
L
Questions
100
Answers
1
Which of the following information is NOT included in specifications?
Installation Method
Quality of workmanship
Non-guarantee of estimates
Materials
2
What church is considered the “mother of all Roman catholic churches” or the seat of the Roman catholic pope?
St. John Latheran’s Basilica
Hagia Sophia
St. Peter’s Basilica
Florence Cathedral
3
What is the maximum years of imprisonment for an architect for design services without executing a service agreement?
d.6 years
c. 8 years
a. 2 years
b. 4 years
4
What is the maximum length of firewall for commercial, institutional and industrial?
50% of the perimeter
70% of the perimeter
80% of the perimeter
60% of the perimeter
5
Which is perceived by the feel of the surface of a figure, object or form?
Shape
Texture
Form
Tactile
6
Which of the following is non-renewable energy source?
Wind
Geothermal
Coal
Hydraulic
7
A business permit is secured from .
SEC
Mayor’s Office
Brgy Hall
DTI
8
An anthropometric scale of proportions developed by Le Corbusier is called
Humanistic
Modulor
Symmetry
Furnicube
9
How many groups of occupancy are in the Code?
8
16
10
12
10
Which drawing refers to the structural, mechanical, electrical or other construction systems of the project?
Contract Documents
Engineering Drawings
Schematic Drawings
Feasibility Drawings
11
It refers to a line, plane or volume of reference to ?
c. Hierarchy
a. Axis
b. Symmetry
d. Datum
12
Where is Figure “E” located, a house designed by Frank Lloyd Wright?
London, England
Pennsylvania, USA
Chicago, USA
California, USA
13
Which space to space relationship is where spaces share a common border?
Adjacent
Interlocking
Linked
Space within a Space
14
Which of the following laws governs medium cost housing?
BP 220
PD 223
BP 344
PD 957
15
Which is a color to which white is added?
c. Value
b. Tint
d. Tone
a. Shade
16
What is the maximum height of threshold?
25 mm
70 mm
45 mm
13 mm
17
Earliest known prehistoric settlements are .
Cave dwellings
Cromlech
Mud brick communities
Tumuli
18
Which solid is generated by the revolution of a rectangle about one of its sides?
Cylinder
Cone
Sphere
Pyramid
19
Which is not shown in an Architect’s professional seal?
“Architect
Expiration
Name
Registration Number
20
Which spatial organization has a central dominant space about which secondary spaces are grouped?
Clustered
Radial
Linear
Centralized
21
Which palace is a great example of Renaissance palace in Florence, Italy?
Palazzo Medici Riccardi
Parthenon
Palace of Minos
Clunny Abbey
22
Which of the following is NOT a public property?
Public RROW
River Easement
Commercial Parking Lot
Community Park
23
Scope of work, method and amount of compensation are provided in which document?
Bid Proposal
Service Agreement
Technical specifications
Owner-Building Official Agreement
24
How many sets of contract documents are to be given to the owner after its completion?
8 SETS
7 SETS
6 SETS
5 SETS
25
As of 2020, who was the last National Artist for Architecture?
Juan Felipe Nakpil
Ildefonso Santos Jr.
Francisco Mañosa
Leandro V. Locsin
26
The standard length term of office for the members of the Board?
c. 8 years
b. 3 years
a. 2 years
d.6 years
27
Figure “A” is located in _____
Netherlands
Germany
France
England
28
It refers to a unified configuration pattern or field
b. Composition
d. Datum
a. Axis
c. Gestalt
29
According to the building code, what is NOT allowed to be built in a waterway easement?
Esplanade
Promenade
Sidewalk
Private Parking Lot
30
Which section of RA 9266 states that a program of continuing professional development shall be maintained?
Section 28
Section 18
Section 8
Section 38
31
The average eye level of adult is___mm.
1450
1800
1650
1350
32
Who designed the Manila City Hall, Cebu Provincial Capitol ?
Antonio Toledo
Pablo Antonio
Fernando Ocampo
Tomas Mapua
33
Which is not present in the early Christian churches?
Tracery windows
Nave and aisles
Simple timber roof
Rectangular hall
34
Which of the following is NOT a responsibiliy of an architect to the public?
d. He shall file a complaint on the Code of Ethical Conduct.
b. He shall not undertake paid advertisements to promote his services.
c. He shall promote the interest of his professional organization.
a. He shall not deceive others regarding his architectural experience.
35
OCT means .
Original Certificate of Transfer
Offical Certification of Training
Original Certificate of Title
Official Certificate of Title
36
“Architecture is the learned game, correct and magnificent, of forms assembled in the light.”
Louis Sullivan
Eileen Gray
Frank Lloyd Wright
Zaha Hadid
37
Which of the following is renewable energy source?
Petroleum
Biomass
Fossil Fuels
Coal
38
Which of the following element marks a position in space?
Plane
Point
Line
Volume
39
The Figure “C” is designed by which architect?
Walter Gropius
Mies van de Rohe
Frank Lloyd Wright
Philip Johnson
40
Where is Figure “A” located, a church designed by Oscar Niemeyer?
India
USA
Portugal
Brazil
41
Business permits usually expire in the month of
March
December
April
May
42
Which platonic solid is highly centralized and concentrated?
Cone
Cube
Sphere
Pyramid
43
“To provide meaningful architecture is not to parody history but to articulate it.”?
Oscar Niemeyer
Eileen Gray
Daniel Libeskind
Frank Lloyd Wright
44
In the application for ALE, a masters degree is credited as ___ of diversified experience.
6 months
24 months
48 months
12 months
45
Which of the following spaces is considered public?
a. Living room
Bedroom
Comfort Room
Dirty Kitchen
46
Which of the following element marks a position in space?
Line
Arrow
Point
Volume
47
Who designed the first reinforced concrete government structure in 1907?
Carlos Arguelles
William Parsons
Edgar K. Bourne
Andres Luna de San Pedro
48
Thickness of fluid-applied membrane waterproofing are specified in
Gauge number
Grit
Inches
Mils
49
An architect signing and sealing his drawings and specifications assume __________ years of civil liability
20
15
10
30
50
Using the comparative selection, the project owner starts the process by
Negotiation
Evaluation and Ranking
Pre-qualification
Invitation
51
Which is NOT provided in a specification?
Blow-up detail
Material brand or trade name
Installation method
Finished quality
52
A church that is also built over a tomb of a Christian martyr is called
Martyrium
Basilica
Abbey
Cathedral
53
Where did Renaissance start before it spread in other countries?
Italy
Germany
India
Egypt
54
Which method of compensation is appropriate for government projects?
Percentage of Construction Cost
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
Per Diem
55
What type of specifications is prepared during the Contract Document Phase?
Outline Specifications
Rough Specifications
Technical Specifications
Open Specifications
56
Which type flooring is appropriate for industrial flooring?
Concrete tiles
Granite
Porcelain tiles
Epoxy floor
57
Where is Figure “D” located, a school designed by Walter Gropius?
Barcelona, Spain
Paris, France
Chicago, USA
Dessau, Germany
58
Which church has a dome designed by Filippo Brunelleschi in 1436?
Pisa Cathedral
Amiens Cathedral
Florence Cathedral
Reims Cathedral
59
Early Christian churches evolved from .
Greek temples
Chinese pagoda
Roman basilica
Roman palaces
60
In a typical house, which of the following space has a door that swings out?
Comfort Room
Maid’s Room
Storage
Bedroom
61
If an architect registers for sole proprietorship, which agency is he required to register to?
DOLE
SEC
DPWH
DTI
62
My work is not about “form follows function”, but “form follows beauty” or, even better, “form follows feminine”
Rem Koolhas
Frank Lloyd Wright
Oscar Niemeyer
Mies van der Rohe
63
“Architecture should speak of its time and place, but yearn for timelessness.”
Frank Gehry
Leonardo da Vinci
Frank Lloyd Wright
Rem Koolhas
64
Which activity is not sustainable?
Deforestation
Unpaving of grounds
Reforestation
Water Recycling
65
Which of the following is NOT a responsibility of an architect to colleagues and subordinates
c. He shall not enter an ADC wthi direct connectionand competition program.
b. He shall not maliciously criticize other architects works.
a. He shall strive to improve the environment, life and habitat.
d. He shall not render services without written agreement.
66
Colored architecture is more prevalent in which places?
Industrial
Warm
Cool
Rural
67
Which architectural event did NOT directly help in the flourishing of Renaissance Architecture?
Increased interest on classical forms
Architects and artisans were supported by patrons
Development of true arches
Discovery of Ten Books on Architecture
68
On providing architectural services, how much is the general VAT percentage?
10
15
12
20
69
Figure “B” is a _________
Dolmen
Mastaba
Cromlech
Tumulus
70
Which of the following is about the use and effect of space on behavior, communication and interaction?
Anthropometrics
Ergonomics
Ekistics
Proxemics
71
Which architect said “There are 360 degrees, so why stick to one?”?
Frank Gehry
Zaha Hadid
Daniel Libeskind
Renzo Piano
72
Which is NOT a feature of Figure “A”?
Mortise and tenon joints
Underground tomb
Post and lintel blocks
Bluestones and sarsen stones
73
Which of the following is passive sustainable design strategy?
High-efficiency appliances
Automated HVAC
Good building orientation
Low energy loss mechanical systems
74
The height of water closet is cm.
55
40
45
50
75
During the Spanish period, an apartment for migrant workers and chief housing is called
Bahay na Bato
Ayuntamiento
Accessoria
Plaza
76
Which term means “putting together” or the organization of the architectural elements using the principles of design?
c. Symmetry
b. Datum
d. Hue
a. Composition
77
Which organization of spaces is based on proximity or the sharing of a common visual trait or relationship?
c. Centralized
d. Linear
b. Clustered
a. Radial
78
What do you call a long roofed porch lined with railings?
Veranda
Pathwalk
Alley
Balcony
79
What does PNS mean?
Philippine National Specifications
Philippine Natural Society
Philippine National Society
Philippine National Standards
80
A standard bus parking slot measures
2.5m x 5.0m
3.0m x 9.0m
3.6m x 18.0m
3.6m x 12.0m
81
The effectiveness of roofing insulation is determined by its
s -value
SRI
thickness
r -value
82
Which is the central axial space connecting the narthex and bema in a basilica?
Nave
Ambulatory
Apse
Aisle
83
Which of the following zones only allows single side firewall?
R-4
R-1
R-3
R-2
84
Which set of drawings is used to articulate a design concept?
Presentation Drawings
Contract Documents
Feasibility Studies
Specifications
85
Which is filed every April 15?
Professional Tax Receipt
IAPOA
PRC Renewal
Income Tax Return
86
Which of the following is active sustainable design strategy?
High efficiency HVAC system
Sun-shading trees
Good building siting
Proper wind orientation
87
Which of the following is colored red?
Hot water pipe
Gasoline pipe
Cold water pipe
Fire fighting pipe
88
Which is not included in the scope of practice of architects?
Construction supervision
Structural design
Architectural specifications
Structural conceptualization
89
Which is NOT a perception of a red wall?
Cheerfulness
Rage
Passion
Stimulation
90
Which UAP-IAPOA SPP document deals with pre-design services?
204-A
203
202
201
91
1. Figure “C” is located in _______.
Germany
England
Ireland
New Zealand
92
Where is Figure “B” located, a remodelled house by Antoni Gaudi?
London, England
Barcelona, Spain
Florence, Italy
Paris, France
93
The typical office table height is ___mm.
650
750
1050
850
94
Which survey is acquired to determine positions of existing site improvements or structures?
Topographic Survey
As-built Survey
National survey
Air Survey
95
Who was the second National Artist for Architecture?
Ildenfonso Santos Jr.
Pablo Antonio
Leandro Locsin
Juan Felipe Nakpil
96
What is the mattress size for a typical crib?
540 mm x 1600 mm
650 mm x 1250 mm
800 mm x 1500 mm
710 mm x 1320 mm
97
Which is perceived by the visual contrast of the figure outline against its background?
Shape
Form
Texture
Space
98
Which of the following is
NOT
prepared during design development phase?
Outline specifications
Plans and elevations
Diagrammatic layout of construction systems
Initial line drawings
99
Certificate of Occupancy is issued by .
City Hall
Barangay Hall
OBO
Bureau of Fire Protection
100
Type of masonry where the face of stones were not dressed and squared?
Rustication
Ashlar
Hollow
Rough